ROOM AUDIT SHEET

 
Project: ______________________________________________   Project #: ________________
Source: ______________________________________________   Intvwr:     ________________
 
 
Room Name: __________________________________________   ID Number: ______________
Department: __________________________________________   Floor:         ______________
Dimensions: ___________ x ____________                                  Ceiling Ht.: ______________
 
FINISHES:   
   Floor:    ______________________________________________________________________
               ______________________________________________________________________
   Walls:   ______________________________________________________________________
               ______________________________________________________________________
   Ceiling: ______________________________________________________________________
               ______________________________________________________________________
   Doors: #_____ material_______   size___________ window_____ label_____ frame______
              #_____ material_______   size___________ window_____ label_____ frame______
              #_____ material_______   size___________ window_____ label_____ frame______
              #_____ material_______   size___________ window_____ label_____ frame______
 
OCCUPANCY: Number of People:   _______________    Activity:   _________________________
 
EQUIPMENT:
   Quantity     Description                                                Power Requirement           BTU Output
   _______   __________________________________   ____________________   __________
   _______   __________________________________   ____________________   __________
   _______   __________________________________   ____________________   __________
   _______   __________________________________   ____________________   __________
 
LIGHTING:     General       Task          Special: __________________________________
 
                    Work Ht: _______________     FC Required: ______________________________
 
 Type:         
                      Incandescent             Merc Vapor              HID
 
                      Fluorescent                HP Sodium              _________________________
 Diffuser:    
                      Standard                   Small Para Cu          Large Para Cu
 Luminaire: 
                      Direct              Indirect            Sconce             Pendant          Can
 
                      2x4 FL             2x2 FL              1x4 FL             ____________________
 
SPECIAL FEATURES:
                      Clock               Cable TV           Telephone      [ wall or desk ]
 
                      Computer        network             Light Box
 
Reviewer Notes:
 
 
 
 
Share:
Posted: Monday, October 18, 2010 Author: admin
Category: Newsworthy Comments(0)

 

Project Development Checklist Project:                                                                  Project #:  
Job Captain:            
NPI Review Initial/Date: /  
Pre-project Initial/Date: /  
Owner:            
Purpose:
The intent of this document is to stimulate and maintain highly effective communication between the Owner and our design team. The items 
below are meant to stress milestones where dialogue between our respective organizations is critical in achieving a highly successful outcome.     
We find that such reviews help build strong team participation. 
Stages of Review:
                         
Preplanning:
Note: We suggest that the Owner investigate the title history of the site, any existing soil borings, survey and utility information, environmental  
studies, and the presence of any potential assessments or requirements posed by governing municipalities and agencies, such as utility trunkage  
or hook-up fees, and any other issues that might contribute significantly to project schedule and/or costs. The Owner will advise Architect of   
construction budget within project cost. Owner is advised of responsibility for preparing program, and obtaining survey and geotechnical   
investigations, to make service requests with power & telephone companies, and investigate insurance requirements of owner to acquire necessary 
coverage for the project delivery. The Owner is advised of the importance of construction contingency. 
List specific issues that Owner believes might affect planning (such as DEQ, fire marshall concerns, roadway jurisdictions, IT requirements, etc.)
Attach additional pages if necessary. None / As Indentified:
                         
                         
                         
                         
                         
                         
                         
                         
                       
Hooker DeJong Job Captain Date Owner Representative Date
Written Program (owner supplied, supported by design team, review carefully and confirm square footages):
                       
Hooker DeJong Job Captain Date Owner Representative Date
Site Plan Approval (zoning code review, submittal, municipal site plan approval):
                       
Hooker DeJong Job Captain Date Owner Representative Date
Schematic Design (initial code review, preliminary plans and elevations):
                       
Hooker DeJong Job Captain (with AM review/Initial) Date Owner Representative Date
Opinion of Probable Cost (square foot cost based on building type):
                       
Hooker DeJong Job Captain Date Owner Representative Date
Room Audits:
Note: Address specifications for any special items, especially those which relate to choices for interior and exterior colors.
                       
Hooker DeJong Job Captain Date Owner Representative Date
Completion of Design Development (code review):
                       
Hooker DeJong Job Captain (with DL review/initial) Date Owner Representative Date
Opinion of Probable Cost (more detailed cost, work with contractor or CM, contingency):
                       
Hooker DeJong Job Captain Date Owner Representative Date
50% Completion of Construction Documents (code review):
Note: Readdress specifications for any special items, especially those which relate to choices for interior and exterior colors.
   
Share:
Subscribe to RSS

archive
« October 2010 »
S M T W T F S
26 27 28 29 30 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 1 2 3 4 5 6

categories

contributors